C-5 MRT-10 concept model along Katipunan Avenue in Quezon City by Philippine Railways (Sample only model and not affiliated with DOTr). We only support this project to address traffic congestion along Katipunan.
Implementing Agency
Department of Transportation (DOTr)
Project Description
The project involves the design, building, operating and maintaining the approximately 22.5 kilometer mostly elevated Light Railway Transit (LRT) System consisting of sixteen (16) stations along circumferential road C-5 connecting the Ninoy Aquino Terminal Airport (NAIA) Terminal 3 to Quezon City, terminating at Commonwealth Avenue with possible interchange with MRT7 at Tandang Sora Station and LRT Line 2 at Aurora Station. Trains will be stabled at the depot to be built at the UP property in Diliman, Quezon City.